  • High risk construction work:

 

  • involves a risk of a person falling more than 2 m 
  • is carried out on a telecommunication tower 
  • involves demolition of an element of a structure that is load-bearing 
  • involves demolition of an element of a structure that is related to the physical integrity of the structure 
  • involves, or is likely to involve, disturbing asbestos 
  • involves structural alteration or repair that requires temporary support to prevent collapse 
  • is carried out in or near a confined space 
  • is carried out in or near a shaft or trench deeper than 1.5 m or a tunnel 
  • involves the use of explosives 
  • is carried out on or near pressurised gas mains or piping 
  • is carried out on or near chemical, fuel or refrigerant lines 
  • is carried out on or near energised electrical installations or services 
  • is carried out in an area that may have a contaminated or flammable atmosphere 
  • involves tilt-up or precast concrete 
  • is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians 
  • is carried out in an area of a workplace where there is any movement of powered mobile plant 
  • is carried out in areas with artificial extremes of temperature 
  • is carried out in or near water or other liquid that involves a risk of drowning 
  • involves diving work. 

Safe work method statements (SWMS) 

A PCBU that carries out high risk construction has additional WHS duties. These include requirements to prepare, keep, comply with and review a SWMS for the work. The PCBU must provide a copy of the SWMS to the principal contractor.  

A SWMS is a document that sets out: 

  • high risk construction work activities 
  • hazards that could happen from these activities, and  
  • how the PCBU will control the risks. 

The Safe work method statement for high risk construction work information sheet provides information on preparing a SWMS. 

The interactive safe work method statement (SWMS) tool provides information on preparing, using and reviewing SWMS for high risk construction work.

  • Did you know

    The WHS regulator in your state or territory can provide practical advice, resources and tools to help you be safe when working in construction. They can also let you know which WHS laws apply to you.

Further Advice

SWA is not a regulator and cannot advise you about WHS issues in the workplace. If you need help please contact your state or territory work health and safety authority.