- involves a risk of a person falling more than 2 m
- is carried out on a telecommunication tower
- involves demolition of an element of a structure that is load-bearing
- involves demolition of an element of a structure that is related to the physical integrity of the structure
- involves, or is likely to involve, disturbing asbestos
- involves structural alteration or repair that requires temporary support to prevent collapse
- is carried out in or near a confined space
- is carried out in or near a shaft or trench deeper than 1.5 m or a tunnel
- involves the use of explosives
- is carried out on or near pressurised gas mains or piping
- is carried out on or near chemical, fuel or refrigerant lines
- is carried out on or near energised electrical installations or services
- is carried out in an area that may have a contaminated or flammable atmosphere
- involves tilt-up or precast concrete
- is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
- is carried out in an area of a workplace where there is any movement of powered mobile plant
- is carried out in areas with artificial extremes of temperature
- is carried out in or near water or other liquid that involves a risk of drowning
- involves diving work.
Safe work method statements (SWMS)
A PCBU that carries out high risk construction has additional WHS duties. These include requirements to prepare, keep, comply with and review a SWMS for the work. The PCBU must provide a copy of the SWMS to the principal contractor.
A SWMS is a document that sets out:
- high risk construction work activities
- hazards that could happen from these activities, and
- how the PCBU will control the risks.
The Safe work method statement for high risk construction work information sheet provides information on preparing a SWMS.
The interactive safe work method statement (SWMS) tool provides information on preparing, using and reviewing SWMS for high risk construction work.